Contracting Authority:
Dbayee Outfall
The Lebanon WaterFront City project is located on the reclaimed area at Dbayed. It is on the Joseph Khoury Marina.
The total surface area of the project is 1 003 000 m². The property of reclaimed area is divided up as follows:
- 193,655 m² for the MAF-Khoury Joint Venture (MJV);
- 55,412 m² for MAJID AL FUTTAIM PROPERTIES (M100);
- 274,004 m² for the Lebanese Government;
- 75,661 m² for Others;
- 404,268 m² for Roads, Public…
The government approved the original project in 1995.
The original layout considered two solutions for the processing (treatment/disposal and re-use) of wastewater:
• An ultimate solution, which includes a sewage pumping station that discharges into a network installation and an off-site sewage treatment facility.
• A temporary solution, where a discharge channel into the sea would be designed and built at the southern end of the project with a decantation basin for Phase I and IA of the “Joseph Khoury Marina” project.
The study aims to optimize and validate the design of its sewage outfall.