Contracting Authority:
Var department – DGRTFAM
‘Provence Méditerranée Est’ Technical Division
Municipalities of BORMES-LES-MIMOSAS and LAVANDOU
Recalibration of the Batailler bridge
As part of our partial project management mission to recalibrate the Batailler bridge, crossing the departmental road RD298 in Bormes-les-Mimosas, our mission included the following standardized project management elements:
• Preliminary study of the crossing structure and the roadway
• Preliminary design study of the Battailler river crossing and roadwork
• Roadway structure project for crossing the Battailler river and roadwork
• Assistance to the contracting authority, including the preparation of bidding documents and bid analysis:
• Inspection and signature of working drawings
Current progress: Preliminary studies, Phase 1, Site inventory and sketches of structure locations